Tile risk assessment

Tiling looks like low-risk work, but HSE's guidance on cement-based products is clear that they cause dermatitis and burns, and some skilled tradespeople have had to leave their trade because of it. Add the dust from cutting tiles, hours on the knees, heavy boxes and a wet saw on a mains lead, and a tiling risk assessment has plenty to cover. This page follows HSE's Assess, Control and Review model for cement and sets out the other hazards alongside it.

Based on HSE — Construction hazardous substances: Cement, read 2026-10-19. This page is a starting point you must adapt to your own site, people, equipment and the client's rules. It is not a substitute for an assessment by a competent person.

Hazards and controls

HazardWho is at riskControls
Cement-based adhesive, grout and screed on the skin (dermatitis, burns)Tilers, labourersPre-mixed products where possible; waterproof gloves suitable for alkaline substances (some nitrile or PVC gloves may be suitable), long or tight at the cuff so cement cannot get trapped inside; skin care products; workers trained to spot the early signs of dermatitis.
Allergic contact dermatitis from chromateTilersCement bags rotated and used before the shelf date — the ingredient added to reduce hexavalent chromium only works for a limited period; existing skin or allergy problems checked before the work starts.
Cement in the eyesTilers, labourersEye protection when mixing powder; emergency eyewash available to wash out any cement that gets into the eyes.
Cement powder and cutting dustTilers, people nearbyCement powder is a respiratory irritant and the dust produced by cutting or drilling dried concrete and mortar can cause more serious lung disease, so tile cutting is controlled the same way — wet cutting or on-tool extraction, FFP3 respiratory protection that is face-fit tested, cutting done away from other trades.
Kneeling on wet adhesive and screedFloor tilersWaterproof knee pads or kneeling boards; waterproof trousers worn over the top of boots; time spent kneeling kept to a minimum.
Manual handling of tile boxes, adhesive bags and slabsTilers, labourersDeliveries placed close to the work; boxes split or carried by two where heavy; large-format tiles moved with suction lifters or a trolley.
Wet tile cutter and electric mixersTilersEquipment checked before use; reduced-voltage or RCD-protected supply; leads kept out of water and away from the cutting area; damaged leads taken out of service.

Method statement — sequence of work

  1. Products and quantities listed from the job spec; pre-mixed or lower-contact options chosen where possible and bag shelf dates checked.
  2. Welfare in place before mixing starts: hot and cold or warm running water, soap and towels, basins big enough to wash forearms.
  3. Cutting station set up wet or with extraction, on a protected supply, away from other trades; gloves, knee protection and RPE issued and checked.
  4. Skin washed at breaks and at the end of the day; skin checks by a trained responsible person recorded as part of health surveillance.

What to include in the written assessment

Tilers setting up on their own often weigh up the differences between a sole trader and a limited company before taking on their first contract.

Get the document

Download the free risk assessment template (Word) and fill in the table above for your job, or have the RAMS generator produce a completed risk assessment and method statement for this trade in Word for £19.

Questions

Why does a tiling risk assessment need health surveillance?

HSE's cement guidance says health surveillance is needed to check the controls are preventing dermatitis. A trained responsible person checks a new worker's skin at the start and periodically after, and keeps secure records.

Are latex or fabric gloves enough for tile adhesive?

HSE says gloves for cement should be waterproof and suitable for high pH (alkaline) substances, with a suitable breakthrough time for the job, and long or tight at the cuff. Fabric gloves soak up wet cement and hold it against the skin.

Need the finished document, not just the guide?

Answer a few questions about the job and get a completed RAMS in Word, ready to send — £19 including VAT, supplied straight after payment.

Build my RAMS — £19

Also as editable Word files, £9 each: Method statement template · Health and safety policy template.