The injuries that end a bricklayer's working life are rarely dramatic: a back worn out by heavy blocks, hands ruined by cement, knees from stooping into foundation trenches. HSE's construction health guidance on blocks and masonry units is the core of a bricklaying risk assessment, with falls, scaffold loading and dust alongside. This page lists the hazards and the controls.
Based on HSE — Construction manual handling: blocks and masonry units, read 2026-10-18. This page is a starting point you must adapt to your own site, people, equipment and the client's rules. It is not a substitute for an assessment by a competent person.
Hazards and controls
| Hazard | Who is at risk | Controls |
|---|---|---|
| Manual handling of heavy blocks | Bricklayers, labourers | The lightest block that meets the design's performance criteria; thinner dense blocks laid flat or lighter trench blocks with handholds where possible; mechanical handling for dense and specialist blocks — relying on two people to lift heavier blocks is not usually a suitable solution. |
| Stooping and reaching | Bricklayers | Working platforms set so laying happens between chest and knee height; foundation trenches widened so nobody stoops below foot level; materials stacked at waist height. |
| Cement and mortar on the skin — burns and dermatitis | Bricklayers, labourers | Gloves that protect against cement and mortar as well as cuts and abrasions; washing facilities with warm water, soap and towels; contaminated clothing changed. |
| Falls from working platforms and trestles | Bricklayers | Scaffold or tower with guardrails and toeboards; hop-ups and trestles only within the manufacturer's limits and never at a height where a fall could cause injury. |
| Collapse of unsupported trench sides while laying below ground | Bricklayers | Trench supported or battered as the excavation risk assessment requires before anyone works in it. |
| Silica dust from cutting bricks and blocks | Bricklayers, people nearby | Blocks cut with water suppression or on-tool extraction; FFP3 respiratory protection face-fit tested; cutting away from other trades. |
Method statement — sequence of work
- Block type agreed with the designer at tender stage with weight in mind; pallets delivered close to the work and lifted mechanically.
- Platforms and material stacks set to keep laying between chest and knee height; trench width checked before below-ground courses.
- Gloves and washing facilities in place before mixing starts; cuts made wet or with extraction.
- Scaffold inspected before loading; loads kept within the scaffold's class and spread along the lift.
What to include in the written assessment
- Site address, the task, the date and who carried out the assessment.
- Each hazard above with the people at risk, the controls in place and the residual risk rating.
- The equipment, PPE and competence (training, cards) the controls depend on.
- Emergency and rescue arrangements, first aid and the nearest A&E.
- A review date and a signature line for the person in charge and the operatives who have read it.
Get the document
Download the free risk assessment template (Word) and fill in the table above for your job, or have the RAMS generator produce a completed risk assessment and method statement for this trade in Word for £19.
Questions
Is there a maximum block weight for one-person lifting?
HSE does not set a figure on this page; it says the risk rises with the weight of the block and expects the lightest block that meets the design, or mechanical handling for dense blocks. The 20 kg figure often quoted in the trade comes from older HSE construction guidance on handling building blocks; the current page does not repeat it, so treat it as a trade convention rather than a legal limit.
Why is cement a risk assessment item?
Wet cement is alkaline and causes burns and dermatitis, and the dust from cutting contains silica. Gloves, washing facilities and dust suppression are the standard controls.
Need the finished document, not just the guide?
Answer a few questions about the job and get a completed RAMS in Word, ready to send — £19 including VAT, supplied straight after payment.
Build my RAMS — £19Also as editable Word files, £9 each: Method statement template · Health and safety policy template.