Asbestos risk assessment

Most trades who drill, fix or strip out in older buildings will meet asbestos sooner or later. HSE's starting point is that most higher-risk work with asbestos must only be done by a licensed contractor, and that the decision on whether a task is licensable is based on the risk — not on how small the job looks. This page is for the risk assessment that all non-licensed and notifiable non-licensed work needs. If your task falls into the licensable category, this page does not cover it: stop and bring in a licensed contractor.

Based on HSE — Non-licensed work with asbestos, read 2026-10-19. This page is a starting point you must adapt to your own site, people, equipment and the client's rules. It is not a substitute for an assessment by a competent person.

Hazards and controls

HazardWho is at riskControls
Licensable work carried out without a licenceOperatives, building occupantsBefore work starts, check the task against HSE's examples. Removing sprayed coatings, work that may disturb pipe lagging, loose fill insulation, asbestos millboard, significant quantities of loose debris and AIB work that will not be short duration are licensable — stop and appoint a licensed contractor.
Unknown asbestos-containing materials (ACMs)Operatives, other tradesAsk for the asbestos register or survey before starting; presume suspect material in an older building contains asbestos until a sample analysed by a competent person shows otherwise; no drilling, cutting or breaking until the answer is known.
Fibre release during short maintenance tasksOperatives, people nearbyOnly sporadic, low-intensity work where exposure will not exceed the control limit of 0.1 f/cm3 (averaged over four hours) — for example drilling textured coatings for fixings, or removing loosely screwed AIB panels for access — using the dust-reducing method in the relevant Asbestos Essentials task sheet.
Breaking up material during removalOperatives, publicAsbestos cement sheets and rainwater goods removed carefully without breaking them up; if the material will be substantially damaged or broken up (fire or flood damage, 'dropping' a roof) the work becomes notifiable non-licensed work with extra duties.
Notifiable non-licensed work (NNLW) handled as ordinary workOperativesWhere the task is NNLW, notify the work before it starts, arrange medical surveillance for the workers and keep the required records.
Untrained operativesOperatives, others in the areaEveryone doing the work has the correct level of information, instruction and training for non-licensed asbestos work before they start.
Contaminated waste and debris left behindOccupants, other tradesOnly small quantities of loose debris cleaned up as non-licensed work; waste bagged, labelled and disposed of as asbestos waste; larger quantities of loose debris treated as licensable.

Method statement — sequence of work

  1. Asbestos survey or register checked; the material, its condition and the task identified and compared with HSE's examples of non-licensed, NNLW and licensable work.
  2. If the task is licensable, work stops and a licensed contractor is appointed. If NNLW, the notification is made before starting.
  3. Work area segregated; the Asbestos Essentials task method followed with the controls and protective equipment it lists; material kept intact as far as possible.
  4. Area cleaned and checked; waste bagged and removed; records (and medical surveillance for NNLW) kept up to date.

What to include in the written assessment

Asbestos work leaves a paper trail of surveys, notifications and health records, and the business side has its own rules on how long to keep business records such as invoices and receipts.

Get the document

Download the free risk assessment template (Word) and fill in the table above for your job, or have the RAMS generator produce a completed risk assessment and method statement for this trade in Word for £19.

Questions

What makes asbestos work non-licensed?

HSE says the work must be sporadic and of low intensity, carried out so exposure will not exceed the control limit of 0.1 f/cm3 averaged over four hours, and meet at least one condition: a short non-continuous maintenance task on non-friable material, removal of material in reasonable condition held in a matrix, sealing or encapsulating material in good condition, or air monitoring and sampling.

Can I remove asbestos insulating board myself?

Only in the limited cases HSE lists, such as removing loosely screwed AIB panels to reach pipework or drilling holes for shelving as short-duration work. Work on AIB that the risk assessment shows will not be of short duration is licensable and must be done by a licensed contractor.

Need the finished document, not just the guide?

Answer a few questions about the job and get a completed RAMS in Word, ready to send — £19 including VAT, supplied straight after payment.

Build my RAMS — £19

Also as editable Word files, £9 each: Method statement template · Health and safety policy template.