Hot work — grinding, cutting, welding, brazing, torch-applied roofing, anything that makes sparks or flame — is the classic cause of fires that start after the trade has packed up. HSE's construction fire guidance expects combustibles cleared before the work starts, suitable extinguishers to hand, a careful watch kept throughout, and on larger projects a permit-to-work system. This page turns that into a risk assessment and a working sequence.
Based on HSE — Process fire risks, read 2026-10-18. This page is a starting point you must adapt to your own site, people, equipment and the client's rules. It is not a substitute for an assessment by a competent person.
Hazards and controls
| Hazard | Who is at risk | Controls |
|---|---|---|
| Ignition of combustible materials nearby | Everyone in the building | Area cleared of combustible materials before hot work starts; what cannot be moved is covered with fire-resistant blankets; openings and voids that sparks could enter are sealed. |
| Fire breaking out after the work has finished | Occupants, neighbouring premises | A careful watch maintained throughout the work and the area checked again before leaving — insurers commonly specify a set period after the last hot work, often an hour. |
| No means to fight a small fire | Operatives | Suitable fire extinguishers at the workstation, chosen for the fuel present; operatives shown how to use them. |
| Uncontrolled hot work on a larger site | Everyone on site | A permit-to-work system so the site manager knows where and when hot work happens, what precautions were set, and when the watch ended. |
| Flammable vapours, gases or dusts | Operatives | Gas-free check where tanks, drums or voids are involved; no hot work until the atmosphere is confirmed safe; ventilation maintained. |
| Burns and fume to the operative | Operatives | Gauntlets, face shield or welding helmet, flame-resistant clothing; fume extraction or RPE for the process in use. |
Method statement — sequence of work
- Permit raised (where the site uses one) stating the location, the work, the start and finish time and the length of the fire watch.
- Combustibles moved at least 10 m away or covered; voids and gaps sealed; extinguisher and fire blanket placed within reach.
- Work carried out with a second person on fire watch where the area or materials make it necessary.
- Watch continued after the work stops; the area checked again before the site is closed; the permit signed off.
What to include in the written assessment
- Site address, the task, the date and who carried out the assessment.
- Each hazard above with the people at risk, the controls in place and the residual risk rating.
- The equipment, PPE and competence (training, cards) the controls depend on.
- Emergency and rescue arrangements, first aid and the nearest A&E.
- A review date and a signature line for the person in charge and the operatives who have read it.
Get the document
Download the free risk assessment template (Word) and fill in the table above for your job, or have the RAMS generator produce a completed risk assessment and method statement for this trade in Word for £19.
Questions
Is a hot work permit a legal requirement?
No specific law names it, but HSE describes a permit-to-work system as a way to manage the risk on larger projects, and most contracts and insurers require one.
How long must the fire watch last?
HSE's guidance is to keep a careful watch throughout the work. Insurers commonly specify a period after the last hot work — check the policy and the site rules, and record the time on the permit.
Need the finished document, not just the guide?
Answer a few questions about the job and get a completed RAMS in Word, ready to send — £19 including VAT, supplied straight after payment.
Build my RAMS — £19Also as editable Word files, £9 each: Method statement template · Health and safety policy template.