MEWP risk assessment

Mobile elevating work platforms — cherry pickers, boom lifts, scissor lifts — are usually the safest way to work at height, which is why HSE's guidance concentrates on the four ways they go wrong: entrapment against structures, overturning, falls from the basket and collision. This page lists those hazards and the controls a MEWP risk assessment has to show, from selection and ground conditions to the rescue plan.

Based on HSE — Mobile elevating work platforms (MEWPs), read 2026-10-18. This page is a starting point you must adapt to your own site, people, equipment and the client's rules. It is not a substitute for an assessment by a competent person.

Hazards and controls

HazardWho is at riskControls
Entrapment or crushing against overhead structuresOperatorOperators briefed on the danger; MEWPs with shrouded or protected controls considered; platform kept tidy; ground staff trained to use the ground controls to bring a trapped operator down.
OverturningOperator, people nearbyFirm, level ground; temporary covers strong enough for the load; hidden features such as trenches, manholes and loose backfill identified; machine selected for the job and site with great care.
Falls from the basketOperatorWhere a fall remains possible, a harness with a short work-restraint lanyard clipped to the manufacturer's anchor point inside the basket.
Collision with pedestrians, vehicles or overhead cablesOperator, public, other workersArm kept clear of overhead cables and traffic routes; exclusion zone at ground level; banksman where the machine travels.
Untrained or unfamiliar operatorOperator, everyone nearbyCertificate or card from a recognised course listing the MEWP categories, expiry checked; familiarisation on the specific model before use.
Wind and weatherOperatorMaximum safe wind speed set and observed; platform inspected after storms or heavy snow.
Defective machineOperatorDaily visual checks and scheduled servicing; reported defects acted on quickly; safety-critical faults take the machine out of service; thorough examination by a competent person at least every six months.

Method statement — sequence of work

  1. Site and task reviewed to select the right category of MEWP; ground conditions and overhead hazards walked and recorded.
  2. Operator's card checked and model familiarisation given; pre-use inspection completed and signed.
  3. Exclusion zone set; harness and restraint lanyard worn in boom-type machines; maximum wind speed confirmed.
  4. Rescue plan agreed and practised — ground controls, who operates them, how the operator is brought down — before the first lift.

What to include in the written assessment

Get the document

Download the free risk assessment template (Word) and fill in the table above for your job, or have the RAMS generator produce a completed risk assessment and method statement for this trade in Word for £19.

Questions

Is a harness required in a scissor lift?

HSE's guidance is that where a fall from the basket remains possible, a harness and a short restraint lanyard are worn, clipped to the manufacturer's anchor point. The risk assessment for the specific machine and task decides.

How often does a MEWP need a thorough examination?

At least every six months by a competent person, on top of daily visual checks and the manufacturer's service schedule.

Need the finished document, not just the guide?

Answer a few questions about the job and get a completed RAMS in Word, ready to send — £19 including VAT, supplied straight after payment.

Build my RAMS — £19

Also as editable Word files, £9 each: Method statement template · Health and safety policy template.