Disclaimer: this template is a starting point only. You are responsible for assessing the risks of your own work, and for making sure any document you produce from it is suitable and sufficient for the task, the site and the people involved. It is not health and safety advice.
For the full guide to what PUWER requires, read PUWER risk assessment: a step-by-step guide.
What's in the template
- Equipment details — what it is, where it is, who uses it
- PUWER checklist — 17 checks, each tied to its regulation
- Risk rating — before and after actions, on a 5 × 5 scale
- Action plan — every "no" from the checklist, with a name and a date
- Inspection record
- Maintenance log
- Authorised and trained users
- Briefing record — sign-off sheet
The checklist, regulation by regulation
| Regulation | What you are checking |
|---|---|
| Reg 4 | The equipment is suitable for the job, the place and the people |
| Reg 5 | It is maintained in good working order, with a log where it has one |
| Reg 6 | It is inspected where safety depends on how it's installed or it can deteriorate |
| Reg 7 | Use is restricted to designated people where there is a specific risk |
| Regs 8–9 | Users have the information, instructions and training they need |
| Reg 10 | It meets the product safety requirements that applied when it was supplied |
| Reg 11 | Dangerous parts are guarded |
| Regs 12–13 | Protection against specified hazards and hot or very cold parts |
| Regs 14–18 | Start, stop and emergency stop controls work and are marked |
| Reg 19 | It can be isolated from its energy sources |
| Regs 20–21 | It is stable, and the lighting is good enough |
| Reg 22 | Maintenance can be done safely |
| Regs 23–24 | It carries the markings and warnings it needs |
Inspection or maintenance?
They are different duties. Maintenance (regulation 5) keeps equipment working safely — servicing, repairs, replacing worn parts. Inspection (regulation 6) is a check by a competent person to find deterioration before it becomes dangerous, and applies where safety depends on how the equipment is installed or where it is exposed to conditions that can make it deteriorate. Record both: sections 5 and 6 of the template are for exactly that.
Lifting equipment has its own extra rules under LOLER. For lifts, use the lifting plan template.
Working on someone else's site? The principal contractor will usually want a RAMS. Build a completed RAMS in Word, £19 including VAT.
Five or more employees? The law also requires a written health and safety policy. Ours is ready to edit, with the statement already written: health and safety policy, £9 including VAT.
More templates
Free downloadRisk assessment template
General workplace risk assessment for any small business — hazards, controls, risk rating and action plan.
Free downloadFire risk assessment template
The five government steps, fire safety arrangements and the written record required since October 2023.
£9 Word templateHealth and safety policy template
The written policy employers with five or more staff must have — statement, organisation and arrangements.
Free downloadDSE assessment template
Workstation checklist for computer and laptop users, in the office or at home.
Free downloadLone working policy template
The rules for everyone who works alone — responsibilities, check-ins and emergencies.
Free downloadRAMS template
Risk assessment and method statement combined — what most principal contractors ask for.
£9 Word templateMethod statement template
Step-by-step sequence of works, roles, plant, PPE and emergency arrangements.
Free downloadCOSHH risk assessment template
For hazardous substances — safety data sheet details, controls, storage, spills and first aid.
Free downloadManual handling risk assessment template
Lifting, carrying, pushing and pulling — task, load and environment factors, with controls.
Free downloadNoise risk assessment template
Noise sources and exposure against the legal action values, controls and hearing protection.
Free downloadDSEAR risk assessment template
Flammable substances and ignition sources — controls, storage and emergency arrangements.
Free downloadElectrical risk assessment template
Dead-working check, safe isolation steps, competence and controls for work on or near electricity.
Free downloadLone working risk assessment template
For anyone working alone — risk factors, check-in arrangements and emergency plans.
Free downloadWorking at height risk assessment template
Ladders, towers, roofs and openings — equipment choice, controls in the right order and a rescue plan.
Free downloadLifting plan template
The load, equipment, capacity check, site set-up, roles and lift sequence for lifts under LOLER.
Free downloadSafe system of work template
Who may do the task, checks before starting, the safe sequence, stop-work rules and review.
